Reference & limitations
GP01/RT Rev.8: §10.4–10.9, Tables 1–6, pp. 8–12, 16–18. Film quantities are minimum guidance for full circumferential examination, subject to coverage and approved technique. Maintain at least 25 mm overlap where applicable. Single wall preferred when practical. DWDI requires source-side IQI.
Engineering draft — Level III verification required before operational use. Table 3 overlaps at >6–6.4 mm; stricter first row is used and flagged. Table 5 W13 wire 16 is printed as 0.010 mm versus 0.100 mm in W10: W13 wire 16 excluded pending clarification. Table 1 NPS 8 has two alternatives; its small-film IQI quantity differs between the merged Table 1 placement cell and §10.8.1; confirm with Level III (use at least 2 pending clarification). NPS 14–16 Sch 100 overlaps. Both are displayed. Table 1 is not a schedule-to-thickness database.